Entering Meter Readings

< Previous section  |  Table of Contents  |  Index  |  Next section >

If you want MainBoss to schedule preventive maintenance based on meter readings, it is important to type in those meter readings on a regular basis. When a particular meter passes the point where maintenance is required, MainBoss will generate an appropriate work order for the preventive maintenance work (provided that you follow the steps described in Generating Preventive Maintenance Work Orders).

There are two ways to enter a new meter reading:

In both cases, MainBoss opens a window that contains the following: