Application: Man Hours 2/Fixture
This applies to both fixed and portable spotlights used in the lighting and
highlighting of performers and stage areas in auditoriums and large conference
rooms.
Special Instructions:
1. Keep record of hour usage of spotlight bulb, noting its estimated life and
date of installation.
2. Obtain and review manufacturer's instructions and precautions.
Items to Check & Initial Completion:
1. ___ Check power supply cord and connections to plug.
2. ___ Remove necessary access panels.
3. ___ Check connection at, and operation of switch. Lubricate as needed.
4. ___ Clean lens and reflector.
5. ___ Lubricate and check operation of all slide rods, adjust rods and linkage.
6. ___ Check bulb and socket, clean or change as required.
7. ___ Clean housing interior.
8. ___ Clean and check operation of color slides.
9. ___ Replace removed access panels.
10.___ Lubricate wheels and pivot points as required.
11.___ Check mounting supports.
12.___ Clean exterior of unit.
13.___ Test.
14.___ Clean up work area.
Tools and Materials:
1. Standard Tool Kit
Plus Insulated pliers and screwdrivers
Wire strippers
Wire crimpers
Voltmeter - Ohmmeter - Milliammeter
Clamp on meter(volt - ohm - amp meter)
Soldering kit
1/8" 25' fish tape
Burnishing tool
2. Lubricants. Consult the Material Safety Data Sheets (MSDS) for hazardous
ingredients and proper personal protective equipment (PPE).
3. Cleaning tools and materials. Consult the MSDS for hazardous ingredients and
proper PPE.
4. New bulb
Table of Contents | Next