Man Hours 1
Special Instructions:
The work required by this procedure may cause the activation of an alarm and/or a
supervisory signal. The field office manager and the control center or fire
department that will receive the alarm and/or signal must be notified prior to
start of work. On systems which do not have a manual start button, close
starting circuit mechanically.
Items to Check & Initial Completion:
1. ___ Check for proper oil and coolant levels, fuel supply, and battery
electrolyte.
2. ___ With all valves in normal position, start drive motor or engine.
3. ___ Observe oil pressure or ammeter for normal operating range.
4. ___ Run engine until coolant reaches normal operating temperature.
5. ___ If connected to timer cycle, run motor until automatic shutoff.
6. ___ Examine pump packing for excessive water leakage (small leakage is
necessary).
7. ___ Feel pump and motor bearings for excessive heat.
8. ___ Check for proper supervisory signals. When applicable, supervised
temperature and oil pressure circuits should be mechanically closed and
checked for proper signals.
9. ___ Test batteries for full charge.
10.___ Clean up and remove all debris from work area.
Tools & Materials:
1. Standard Tool Kit
Plus Insulated pliers and screwdrivers
Wire strippers
Wire crimpers
Voltmeter - Ohmmeter - Milliammeter
Clamp on meter(volt - ohm - amp meter)
Soldering kit
1/8" 25' fish tape
Burnishing tool
2. Battery tester.
Table of Contents | Next