Man Hours .25
Special Instructions:
The work required by this procedure may cause the activation of an alarm and/or a
supervisory signal. The office manager and the control center or fire
department that will receive the alarm and/or signal must be notified prior to
start of work. (See FPAUTOFDCT/AL-A).
Items to Check & Initial Completion:
1.___ Remove all hold-open devices such as fusible links except approved
electro-magnetic hold open devices.
2.___ Check hang and swing for close fit. Doors must latch on normal closing
cycle and have a neat fit.
3.___ Remove any obstructions that retard full swing or movement of door.
4.___ Test operation of panic hardware. Inspect door coordinates on pairs.
6.___ Check operation of any special devices such as smoke detectors or magnetic
door releases.
7.___ Inspect door for damage.
8.___ Clean up work area and remove all trash.
Tools & Materials:
1. Standard Tool Kit