FANCENTF-A Fan, Centrifugal - Annual

                                                    Man Hours 1
Special Instructions:

1.  Review manufacturer's instructions.
2.  Schedule shut-downs with operating personnel, as needed.
3.  Deenergize, lock out and tag fan motor electrical circuit.


Items to Check & Initial Completion:

1. ___ Check fan blades for dust buildup and clean if necessary.
2. ___ Check fan blades and moving parts excessive wear.  Clean as needed.
3. ___ Check fan RPM to design specifications.
4. ___ Check bearing collar set screws on fan shaft to make sure they are tight.
5. ___ Vacuum interior of unit if accessible.  Clean exterior.
6. ___ Lubricate fan shaft bearings while unit is running.  Add grease slowly
       until slight bleeding is noted from the seals.  Do not over lubricate.
       Remove old or excess lubricant.
7. ___ Check belts for wear, adjust tension or alignment, and replace belts when
       necessary.  Multiple belt drives should be replaced with matched sets.
8. ___ Check structural members, vibration eliminators, and flexible connections.
9. ___ Schedule PM MOTOREL>1HP-A on motor at same time.
10.___ Remove all trash and clean area around fan.


Tools & Materials:

1.  Standard Tool kit.
2.  Tachometer
3.  Cleaning equipment and materials
4.  Vacuum
5.  Grease guns, lubricants
6.  Respirator