CMPTRHVAC-Q Central Mini-Computer, HVAC -Quarterly

                                                             Man Hours 3
Special Instructions:

1.  Schedule maintenance with operating personnel.
2.  Obtain and review manufacturer's information for servicing, testing and
    operating.
3.  Obtain "AS BUILT" diagrams of installation.


Items to Check & Initial Completion:

1.___ Clean, calibrate and adjust all central (main-frame), remote (peripheral)
      and interface systems.
2.___ Test and analyze results for systems operational integrity.
3.___ Test all power supplies and battery charging networks.
4.___ Test all software and firm ware programs for applied results.
5.___ Prepare a written service report as to test results and service performed
      and file with the buildings manager.


Tools & Materials:

1.  Standard Tool kit.
    Plus  Insulated pliers and screwdrivers
          Wire strippers
          Wire crimpers
          Voltmeter - Ohmmeter - Milliammeter
          Clamp on meter(volt - ohm - amp meter)
          Soldering kit
          1/8" 25' fish tape
          Burnishing tool
2.  Manufacturer's testing instruments
3.  Cleaning tools and materials.  Consult the Material Safety Data Sheets (MSDS)
    for hazardous ingredients and proper personal protective equipment (PPE).
4.  Lubricants.  Consult the MSDS for hazardous ingredients and proper PPE.

Table of Contents    |    Next