Q: The Assigned Units section of the Edit Task window has various entries under the Scheduled heading. What do they mean?
A: The following entries may appear in the Scheduled column:
- not scheduled: Used if the unit has no assigned schedule.
- every reading XXX: Used if the unit only has a meter-based schedule. The value XXX indicates the value between scheduled maintenance tasks (e.g. 3000 if the unit is scheduled for maintenance every 3000 miles).
- every XXX Days or every XXX months: Used if the unit only has a date-based schedule. The value XXX tells the number of days or months between scheduled maintenance tasks.
- by both: Used if the unit has exactly one meter-based schedule and one date-based schedule.
- advanced schedule: Used if the unit has more than one meter-based schedule or more than one date-based schedule.