VACUUMCENTRL-A Vacuum System, Centralized - Annual

Application:                                                Man Hours 2.5

This applies to the vacuum producer on centralized, permanently
installed vacuum cleaning systems.  The motor or driver will be serviced using
PM Inspection MOTOREL>1HP-A. Tubing and outlets will be serviced on a service
call basis.
Periodic emptying of the collector is part of the labor force duties.


Special Instructions:

1.  Review the manufacturer's maintenance instructions.
2.  Review Procedure for Selection, Care and Use of Respiratory Protection.


Items to Check & Initial Completion:

1.___ Lubricate as required.
2.___ Check vibration collars and seals for leaks.
3.___ Check interior of tank for damage.
4.___ Inspect screens, bags, bag frames and exhaust parts.
5.___ Remove tags and restore power.
6.___ Operate unit and check for vacuum leaks.
7.___ Check vacuum gauge and controls.


Tools & Materials:

1.  Standard Tool Kit
2.  Portable vacuum cleaner
3.  Sealing compound.  Consult the Material Safety Data Sheets (MSDS) for
    hazardous ingredients and proper personal protective equipment (PPE).
4.  Extra vacuum bag replacements
5.  Respirator and other appropriate safety equipment

Table of Contents    |    Next