STRAINER-Y-A Strainer, Y-Type - Annual

                                                      Man Hours 1
Special Instructions:

The maintenance of Y-type strainers, as outlined by this PM Inspection, should be
scheduled to coincide with the maintenance of the equipment that they are
associated with.


Items to Check & Initial Completion:

1.___ Secure strainer isolation valves.
2.___ Drain strainer housing.
3.___ Back flush if possible or remove and clean strainer cage, if applicable.
4.___ Replace cartridge type and clean out strainer housing, if applicable.
5.___ Reassemble unit or replace drain plug and open isolation valve.
6.___ Check unit for leaks.


Tools and Materials:

1.  Standard Tool Kit
2.  Hose and bucket
3.  Gaskets or gasket material
4.  Cartridge filter replacements

Table of Contents    |    Next