Man Hours 1
Special Instructions:
The maintenance of Y-type strainers, as outlined by this PM Inspection, should be
scheduled to coincide with the maintenance of the equipment that they are
associated with.
Items to Check & Initial Completion:
1.___ Secure strainer isolation valves.
2.___ Drain strainer housing.
3.___ Back flush if possible or remove and clean strainer cage, if applicable.
4.___ Replace cartridge type and clean out strainer housing, if applicable.
5.___ Reassemble unit or replace drain plug and open isolation valve.
6.___ Check unit for leaks.
Tools and Materials:
1. Standard Tool Kit
2. Hose and bucket
3. Gaskets or gasket material
4. Cartridge filter replacements