PMPCENTFRIFGL-A Pump, Centrifugal - Annual

                                            1-24 Hp Man Hours 2
                                          24-100 Hp Man Hours 6
                                            100+ HP Man Hours 7
Special Instructions:

1.  Review manufacturer's instructions.
2.  Pump maintenance should be scheduled to coincide with drive motor PM
    Inspection MOTOREL>1HP-A, and fire pump PM Inspection FPFPMP-A where
    applicable.
4.  De-energize, lock-out and tag circuit.


Items to Check & Initial Completion:

1. ___ Check that base bolts are securely fastened.
2. ___ After shut-down, drain pump housing, check suction, discharge and check
       valve for holding.
3. ___ Remove cover, gland, and packing.
4. ___ Remove corrosion from impeller shaft and housing cover.
5. ___ On pumps with oil ring lubricated bearings, drain oil, flush, and fill to
       proper oil level with new approved type oil.
6. ___ Inspect water rings, seals, and impeller.
7. ___ Clean pump suction strainers, and pump packing water seal filter/strainer.
8. ___ Replace packing, reassemble.
9. ___ Start and stop pump, noting vibration, pressure, and action of check
       valve.
10.___ Adjust packing.
11.___ Lubricate impeller shaft bearings.  Do not over lubricate.
12.___ Check motor and pump alignment.
13.___ Check drive shaft coupling.
14.___ Clean up work area and remove all debris.


COUPLING SIZEALLOWABLE ALIGNMENT

1"-2"0.101 total ind. reading         Reading: _________
Over 2"-4"0.015 total ind. reading    Reading: _________
Over 4"-7"0.020 total ind. reading    Reading: _________


Tools & Materials:

1.  Standard Tool Kit
    Plus Pipe wrenches to 24"
         Tubing cutters
         Flaring tool
         Small acetylene outfit
         Packing tool kit and packing
         3/4" socket set
         Crescent wrenches to 14"
2.  Alignment indicator
3.  Grease gun
4.  Cleaning equipment and materials.  Consult the Material Safety Data Sheets
    (MSDS) for hazardous ingredients and proper personal protective equipment
    (PPE).
5.  Hoist assembly for large pumps