PARKGATEARM-A Parking Arm Gates - Annual

                                                      Man Hours 1
Special Instructions:

1.  Obtain and review manufacturer's instructions.


Items to Check & Initial Completion:

1.___ Lubricate mechanism with graphite.
2.___ Adjust linkage between motor and arm.
3.___ Check and adjust arm pressure.
4.___ Check and adjust sensitivity on magnetic coils embedded in asphalt.
5.___ Fill cracks in asphalt where coils are imbedded.
6.___ Clean and adjust electric breakers.


Tools and Materials:

1.  Standard Tool Kit
    Plus  Insulated pliers and screwdrivers
          Wire strippers
          Wire crimpers
          Voltmeter - Ohmmeter - Milliammeter
          Clamp on meter(volt - ohm - amp meter)
          Soldering kit
          1/8" 25' fish tape
          Burnishing tool
2.  Torque wrenches
3.  Cleaning equipment and materials.  Consult the Material Safety Data Sheets
    (MSDS) for hazardous ingredients and proper personal protective equipment
    (PPE).
4.  Asphalt filler
5.  Appropriate lubricants.  Consult the MSDS for hazardous ingredients and
    proper PPE.

Table of Contents    |    Next