MMHVGIDPRE-A Gas-Fired MUA & Heating Rooftop Equipment (Pre-Season) - Annual

Items to Check & Initial Completion:

 1. ___ Lube fan and motor bearings
 2. ___ Inspect drive and load sheaves
 3. ___ Lube and adjust dampers and linkages (use
        silicone based lubricant)
 4. ___ Check filter(s)
 5. ___ Check motor operating conditions. Take amp.
        reading
 6. ___ Check and tighten all electrical connections
 7. ___ Check and clean humidifiers, if applicable
 8. ___ Check and clean drains and drain pans
 9. ___ Inspect, clean and lube the burner and
        combustion control equipment
10. ___ Check burner sequence or operation and
        combustion air equipment
11. ___ Check all unit panels and secure where required
12. ___ Inspect roof curb flashing
13. ___ Remove debris from roof along w/filter(s) and
        belt(s)


MATERIALS REQUIRED:
1. Belts
2. Filters
3. Lubricants
4. Contact cleaner
5. Panel Screws
6. Cordless drill
7. Panel gasket materials
8. Clean-up materials


Comments and Recommendations:

_______________________________________________________________________________

_______________________________________________________________________________

_______________________________________________________________________________

_______________________________________________________________________________

_______________________________________________________________________________

_______________________________________________________________________________

_______________________________________________________________________________

_______________________________________________________________________________

_______________________________________________________________________________

_______________________________________________________________________________

Table of Contents    |    Next