Man Hours .75
Special Instructions:
1. Review manufacturer's instructions.
3. De-energize, tag, and lock out circuit.
3. Take appropriate safety precautions for working at heights.
Items to Check & Initial Completion:
1.___ Inspect cables and pulleys.
2.___ Lubricate as recommended by the manufacturer.
3.___ Check oil in gear box and add as required.
4.___ Restore power, test and operate.
5.___ Check and adjust brake if required.
6.___ Remove tags from power source.
Tools and Materials:
1. Standard Tool Kit
Plus Insulated pliers and screwdrivers
Wire strippers
Wire crimpers
Voltmeter - Ohmmeter - Milliammeter
Clamp on meter(volt - ohm - amp meter)
Soldering kit
1/8" 25' fish tape
Burnishing tool
2. Grease gun, grease, oil.
3. Lift platform, scaffolding, or ladder as required. Check ladder for defects.
Do not use defective ladders
Table of Contents | Next