KEYCARDSYS-Q Key Card System - Quarterly

                                                     Man Hours 1
Special Instructions:

1.  Review manufacturer's instructions.


Items to Check & Initial Completion:

1.___ Disassemble card reader head and vacuum.
2.___ Check card printer unit and vacuum.
3.___ Check wiring for loose connections, discoloration, etc.
4.___ Change filter - (A).
5.___ Change batteries - (A).
6.___ Check cards to see if codes are in operation.
7.___ Reassemble unit.
8.___ Clean exterior and surrounding are of unit.


Tools and Materials:

1.  Standard Tool Kit
    Plus  Insulated pliers and screwdrivers
          Wire strippers
          Wire crimpers
          Voltmeter - Ohmmeter - Milliammeter
          Clamp on meter(volt - ohm - amp meter)
          Soldering kit
          1/8" 25' fish tape
          Burnishing tool
2.  Spare filter and batteries
3.  Cleaning equipment and material.  Consult the Material Safety Data Sheets
    (MSDS) for hazardous ingredients and proper personal protective equipment
    (PPE).
4.  Vacuum cleaner

Table of Contents    |    Next