Man Hours 1
Items to Check & Initial Completion:
1. ___ Clean strainer ahead of valve. Check valve head and seats for wear and
cutting.
2. ___ Replace valve if seats need regrinding. Send old valve to manufacturer
for overhaul.
3. ___ Steam quality should be examined for foreign matter if valves are being
damaged.
4. ___ Check steam gauges.
5. ___ Check pop safety or pressure relief valve for relieving and seating.
6. ___ Check diaphragms for failure.
7. ___ Check binding of valve stem.
8. ___ Clean and adjust heater deflector fins and element.
9. ___ Clean fan and lubricate motor.
10.___ Adjust weighted lever or spring control tension.
11.___ Clean up work site.
Tools & Materials:
1. Standard Tool Kit
Plus Pipe wrenches to 24"
Tubing cutters
Flaring tool
Small acetylene outfit
Packing tool kit and packing
3/4" socket set
Crescent wrenches to 14"
2. Fin comb
3. Vacuum
4. Lubricants. Consult the Material Safety Data Sheets (MSDS) for hazardous
ingredients and proper personal protective equipment (PPE).