HTRBASEBDALL-2Y Heater - Baseboards/Convectors (All) - 2 Year

                                                     Man Hours 1
Special Instructions:

1.  Review building plans for special instructions where removal of wall panels
    is necessary.
2.  Review any procedures for the Selection, Care, and Use of Respiratory
    Protection.
3.  Review any procedures for the Controlling Hazardous Energy Sources.
4.  Secure, lock out, and tag circulating pumps, steam valves, and electric
    circuits supplying the units to be serviced.
5.  Coordinate PM of associated equipment.
6.  Rope off or post signs at vestibules or entrances where work involves these
    areas.


Items to Check & Initial Completion:

1.___ Remove covers or wall panels.  Note:  Extreme care must be taken when
      removing marble or granite wall panels.  These panels are extremely heavy
      and very fragile.
2.___ Check housing, braces, supports, hangers, and hardware for signs of
      deterioration or damage.
3.___ Wire brush and treat with rust inhibitor all rusted areas.
4.___ Check coils, piping, and fin material for damage, leaks or looseness.
      Straighten finned material as necessary.
5.___ Check temperature or flow controls, shutoff valves, vents and traps for
      proper operation.
6.___ Vacuum or blow out finned tube area and interior housing.
7.___ Touch up paint as required.
8.___ Clean and replace covers or wall panels and caulk wall panels as required.


Tools and Materials:

1.  Standard Tool Kit
2.  Vacuum and/or portable air tank
3.  Goggles, respiratory protection, and gloves
4.  Rope and/or out of service signs
5.  Rust inhibitor and appropriate paints.  Consult the Material Safety Data
    Sheet (MSDS) to ensure that the paint lead level is 0.06% or less and for the
    proper personal protective equipment (PPE).

Table of Contents    |    Next