Man Hours 2
Special Instructions:
1. Secure and tag pumps and valves in the fall.
2. Be alert to any structural damage to the fountain.
Items to Check & Initial Completion:
Fall
1.___ Drain fountain
2.___ Remove fountain head(s)
3.___ Clean scale from head(s) after removing and install cover plate.
4.___ Clean bolts and spacers. Replace defective bolts as needed.
5.___ Check and clean fill tube, remove spacer pipe and cap fill tube.
6.___ Clean overflows and strainers.
Spring
1.___ Remove fill tube cap, install spacer pipe and install fill tube.
2.___ Remove fountain head cover(s) (if applicable) and install fountain head.
3.___ Clean basins
4.___ Remove tags from valves and fill fountain
5.___ Remove tags from pump and put into service.
Tools & Materials:
1. Standard Tool Kit
2. Hip boots
3. Cleaning equipment and materials