FOUNTAINOD-SA Fountain, Outdoors Memorial or Decorative - Semi-Annual

                                                     Man Hours 2
Special Instructions:

1.  Secure and tag pumps and valves in the fall.
2.  Be alert to any structural damage to the fountain.


Items to Check & Initial Completion:

Fall

1.___ Drain fountain
2.___ Remove fountain head(s)
3.___ Clean scale from head(s) after removing and install cover plate.
4.___ Clean bolts and spacers.  Replace defective bolts as needed.
5.___ Check and clean fill tube, remove spacer pipe and cap fill tube.
6.___ Clean overflows and strainers.

Spring

1.___ Remove fill tube cap, install spacer pipe and install fill tube.
2.___ Remove fountain head cover(s) (if applicable) and install fountain head.
3.___ Clean basins
4.___ Remove tags from valves and fill fountain
5.___ Remove tags from pump and put into service.


Tools & Materials:

1.  Standard Tool Kit
2.  Hip boots
3.  Cleaning equipment and materials