Man Hours 3
Items to Check & Initial Completion:
1.___ Drain, clean, and flush drinking water system.
2.___ Disassemble filters, flush and drain.
3.___ Install new gravel, sand, and charcoal.
Tools & Materials:
1. Standard Tool kit.
Plus Pipe wrenches to 24"
Tubing cutters
Flaring tool
Small acetylene outfit
Packing tool kit and packing
3/4" socket set
Crescent wrenches to 14"
2. Respirator.
3. Gravel, sand, and charcoal.