CENTCNTRLP-A Central Control Panel - Semiannual

                                                           Man Hours .25
Special Instructions:

1.  Schedule maintenance with operating personnel.
2.  Obtain and review manufacturer's information for servicing, testing and
    operating.
3.  Obtain "AS BUILT" diagrams of installation.


Items to Check & Initial Completion:

1.___ Clean, lubricate and adjust all electro-mechanical components (printers,
      relays, graphic projectors, command buttons and switches).
2.___ Test data transmission to and from remote panels and input/output devices.
      Recalibrate and/or repair.
3.___ Verify command functions by observing resultant action (on-off, open-close,
      etc.).
4.___ Test alarm report devices and subsystems and analyze visual, audible and
      printed annunciation.  Clean, recalibrate, repair or replace defective
      components.
5.___ Test scanning system.  Repair if necessary.  Note:  Systems incorporating
      open type relays should be cleaned.
6.___ Check operating data.  Analyze for accuracy.


Tools & Materials:

1.  Standard Tool kit.
    Plus  Insulated pliers and screwdrivers
          Wire strippers
          Wire crimpers
          Voltmeter - Ohmmeter - Milliammeter
          Clamp on meter(volt - ohm - amp meter)
          Soldering kit
          1/8" 25' fish tape
          Burnishing tool
2.  Obtain and understand how to use the manufacturer's testing instruments.
3.  Cleaning tools and materials.  Consult the Material Safety Data Sheets (MSDS)
    for hazardous ingredients and proper personal protective equipment (PPE).
4.  Lubricants as specified by equipment manufacturer.  Consult the MSDS for
    hazardous ingredients and proper PPE.
5.  Lint free cleaning cloths.