BOILRE-A Electric Boilers, Electric-Annual

                                                            Man Hours 2
Special Instructions:

1.  Review manufacturer's instructions and ASME Code for boilers.
2.  Review boiler wiring diagram.
3.  Review the Procedure for "Controlling Hazardous Energy
    Sources."
4.  De-energize, lock out, and tag electrical circuits.


Items to Check & Initial Completion:

1.    Clean boiler by:
     a.___ Placing boiler cleaning compound through appropriate opening in top of
           boiler.  (Compound must not react against copper elements).
     b.___ Operate boiler according to instructions.
     c.___ Shut-off power by turning off pilot switch.
     d.___ Open bottom blow-down valve to full open to let sludge and scale blow
           out of boiler.
     e.___ Refill with water and close pilot switch.
2.___ Check nameplate for KW rating, voltage and amperage.  Check electrical
      supply voltage to verify it conforms to boiler requirements.


Tools & Materials.

1.  Standard Tool kit.
    Plus  Insulated pliers and screwdrivers
          Wire strippers
          Wire crimpers
          Voltmeter - Ohmmeter - Milliammeter
          Clamp on meter(volt - ohm - amp meter)
          Soldering kit
          1/8" 25' fish tape
          Burnishing tool
2.  Cleaning compounds.  Consult the Material Safety Data Sheets (MSDS) for
    hazardous ingredients and proper personal protective equipment (PPE).
3.  Clean wiping cloths

Table of Contents    |    Next